Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

This page contains some selected topics on the infrastructure in B84 EPP Lab (B231 / B273), with initial version focusing on aspects related to the ATLAS ITk project.

Electrical Distribution

Most lab equipment take electrical power from the various grey power distribution breaker boxes on the ceiling (Fig 1) which are in turn originated from the breaker panels 2L1 or 2R2 in the Utility Room B245.